Leeds Grand Theatre

Posted on Friday, 19th May 2017 in News
Opened in November 1878, Leeds Grand Theatre at a cost of £62,000, was designed during a backlash against the so-called “common” entertainment of the music halls and without modern disabled access in mind. However, after a multi-million pound refurbishment package covering disabled access and facilities Leeds Grand Theatre have made substantial improvements for it’s patrons. As part of the improvement package Shorts has supplied, and installed, on behalf of Kone, a 630kg capacity MS-MD lift. The MS-MD range is a suite of screw and nut driven MRL passenger lifts designed to comply with the Machinery Directive for application in new and existing shafts. These