Halo, London – Automatic Dumbwaiter Service Lifts

Posted on Wednesday, 22nd April 2020 in Case Studies
Customer Sheridan Lifts Architect Steffian Bradley Architects Lift Manufacturer BKG     Set in the Halo Building, One Mabledon Place, this project required us to design, supply and install a bank of four 20kg capacity automatic dumbwaiter service lifts. With automatic loading and unloading, these lifts facilitate the near touchless transportation of blood and tissue samples between floors within this high-rise laboratory. Halo is the Healthcare Services Laboratories flagship facility. Spread over 11 floors and home to more than 1,000 staff, it has dedicated clinical and non-clinical cores for vertical connectivity. We were involved with this project from the very beginning,